Apr 2026

Loss of connectivity on DC2SCALE PAR3
  • Postmortem
    Postmortem

    Post-mortem: Loss of connectivity on 83.150.218.0/24

    Duration: ~2 minutes (01:08 - 01:10)

    Summary: A network loop was accidentally introduced by an external contractor during a maintenance intervention at approximately 01:10, causing a brief total loss of connectivity on the 83.150.218.0/24 & 217.145.72.0/24 subnet.

    Timeline:

    • 01:08 : Automatic alert triggered by Instatus monitoring, subnet 83.150.218.0/24 detected as down.

    • 01:10 : Root cause identified and resolved: a network loop caused by an external contractor's intervention on-site.

    • 01:15 : Incident officially marked as resolved after monitoring confirmed full recovery.

    Root Cause: An external contractor performing on-site maintenance accidentally created a loopback on the network, which briefly turned our subnet into a very enthusiastic game of ping-pong with itself. Packets were having the time of their lives going in circles, unfortunately at the expense of actual connectivity.

    Impact: Full outage on 83.150.218.0/24 for approximately 2 minutes. All services hosted on this subnet were temporarily unreachable.

    Corrective actions:

    • Loop was removed and connectivity restored immediately upon detection.

    • Reminder sent to external contractors that cables, much like boomerangs, should not come back to where they started.

  • Update
    Update
    This incident has been resolved.
  • Resolved
    Resolved
    This incident has been resolved.
  • Investigating
    Investigating
    Subnet 83.150.218.0/24 is down at the moment. This incident was automatically created by Instatus monitoring.

Mar 2026

Feb 2026

Scheduled Routine Maintenance – POP DIGITAL REALITY PAR5
  • Completed
    February 27, 2026 at 6:52 PM
    Completed
    February 27, 2026 at 6:52 PM
    Maintenance has completed successfully.
  • Update
    February 27, 2026 at 6:25 PM
    Update
    February 27, 2026 at 6:25 PM

    🔧 [IN PROGRESS] Network — PBR & BGP endpoint deployment

    📍 Scope: GCORE PROTECTED transit

    📋 Changes:

    • Policy-Based Routing (PBR) rules added

    • New BGP peering endpoint provisioned

    • TCP MSS clamping enforced on GRE tunnel

    ✅ Goal: Prevent TCP fragmentation on GCORE PROTECTED transit path

  • In progress
    February 27, 2026 at 6:24 PM
    In progress
    February 27, 2026 at 6:24 PM
    Maintenance is now in progress.
  • Completed
    February 27, 2026 at 5:15 PM
    Completed
    February 27, 2026 at 5:15 PM
    Maintenance has completed successfully
  • In progress
    February 27, 2026 at 3:45 PM
    In progress
    February 27, 2026 at 3:45 PM
    Maintenance is now in progress
  • Update
    February 27, 2026 at 3:45 PM
    Update
    February 27, 2026 at 3:45 PM

    Maintenance didn't start yet.

    Will start in around 10 min

  • Planned
    February 27, 2026 at 3:45 PM
    Planned
    February 27, 2026 at 3:45 PM

    We would like to inform our customers that a routine maintenance window has been scheduled at our DIGITAL REALITY PAR5 point of presence.

    During this intervention, our engineering team will carry out the following operations:

    • Network hardware repositioning – Physical reorganization of our network equipment within the cabinet to improve airflow and ensure optimal thermal conditions for all hardware.

    • Rack repositioning of PVE1-DGR-PAR5 – Our server PVE1-DGR-PAR5 will be properly racked. This migration from its current position will significantly improve accessibility for future maintenance and interventions.

    • Capacity expansion – Addition of 2 new Dell PowerEdge R640 servers to our infrastructure in order to meet the growing demand for dedicated server offerings.

    Services may experience brief interruptions during this maintenance window. Our team will do its best to minimize any impact.

    We will provide updates throughout the maintenance and notify you once all operations are completed.

    Thank you for your understanding.

Feb 2026 to Apr 2026

Next